Build the budget in layers
Start with the land and site work, then design and consultants, council and utility charges, the building contract, external works, owner-supplied items, finance and contingency. State whether every figure includes GST and the same scope date.
Do not use an unsourced generic rate as the final allowance. Current written pricing tied to drawings and specifications is the evidence that matters.
For a wider New Zealand comparison alongside these Christchurch-specific costs, see Bracen's guide to building costs in New Zealand. Use current local quotes for your site and design.
- Survey, geotechnical and site investigations
- Design, engineering and other consultants
- Consent, development and utility charges
- House construction and documented allowances
- Driveways, landscaping, fencing and window coverings
- Finance, escalation and contingency